KentOnline

bannermobile

News

Sport

Business

What's On

Advertise

Contact

Other KM sites

CORONAVIRUS WATCH KMTV LIVE SIGN UP TO OUR NEWSLETTERS LISTEN TO OUR PODCASTS LISTEN TO KMFM
SUBSCRIBE AND SAVE
News

M25: Delays after shed load of concrete falls on carriageway

By: Chloe Holmwood cholmwood@thekmgroup.co.uk

Published: 00:00, 31 March 2017

Updated: 08:26, 31 March 2017

Delays have cleared on the M25 after a load of concrete fell on the carriageway.

Two lanes were closed earlier at junction 2 for the Darenth Interchange.

Specialist machinery was required to remove the debris.

The load of concrete caused problems on the M25 this morning. Picture: Justin Scrutton

Highways England were advising drivers to approach the area with care, but the problem is now cleared.

More by this author

sticky

© KM Group - 2024